Our Blog

The garden has been finished with timber retaining walls constructed across the width of the patio. We have removed the existing garage roof and rotten timbers and have fitted new roof timbers in preparation for the profiled steel roof sheets. The floor has been laid in the kitchen/diner and the steel cable balustrades have been installed on the stairs and landing.

Aspect One

So, what do you think ?

You must be logged in to post a comment.

ga('create', 'UA-47086430-1', 'aspectone.co.uk'); ga('send', 'pageview');