We’ve insulated the dormers as planned and plastering to the first floor is complete. First fix electrics and plumbing are also complete. The external kitchen door has been removed and blocked up. The dining room door and window have also been removed, lower wall removed and french doors have been fitted along with new kitchen windows.

Stud work has been constructed in the kitchen to hide the soil pipe and house the extractor. Measurements for this had to be spot on as the kitchen layout is totally dependent on getting this right. Bathroom has been decorated and consideration is being given to the design of the bathroom.